Saturday, April 7, 2012

master bath: phase two

Backer board is up. Walls have been waterproofed (scary red stuff). Curb is built. Pan is built. Bathroom floor has been leveled. J channel is installed for the glass panel. And the tile has begun! These guys are fast and awesome! I'm in love with it already.




No comments:

Post a Comment